Skip to content

Backup and recovery

How much work you could redo, and how long you could stop

Try two example limits around a hypothetical interruption. One is the work you could afford to redo. The other is the time you could afford to be stopped.

Example around one interruption

Before

8 hours

of work to redo

After

16 hours

stopped

Hypothetical interruption

The scale runs 24 hours before the interruption to 24 hours after. Each step is 4 hours. The orange block is work to redo. The solid block is time stopped.

In this example, a hypothetical interruption sits at the mark. The business could afford to redo the previous 8 hours of work. That backward limit is the recovery point objective (RPO). It could afford to be stopped for the next 16 hours. That forward limit is the recovery time objective (RTO).

These hours are example targets for this exercise. A Baseline Review looks at the setup you have and whether a restore has been tried. The proposal then names the covered systems, where the copies sit, and what testing is included.

Take these limits to a Baseline Review

Bring the two example limits with you: how much work you could redo, and how long you could be stopped. We talk about backup and recovery with every managed client, including how a restore would be proved. Which systems are included is written in the proposal.

A useful review asks where the copies are kept, whether one copy sits apart from the everyday systems, whether earlier versions are still there when a problem is noticed, and whether a restore has been tried.

Request a Baseline Review

What is agreed where

In the review

What you have today, and whether a restore has been tried.

In the proposal

Which systems are protected, where copies sit, and what is tested. Backup scope is confirmed in the proposal after the Baseline Review.

Quoted as a project

A new backup platform, a replacement platform, or a ransomware rebuild.

Questions

Are backups included in the monthly fee?

Backup scope, and what we test, is confirmed in the proposal after the Baseline Review. It is not a blanket inclusion on this page.